Current punch list items
Here's the current punch list to give you an idea of where we are at.
We are shooting to have most of this wrapped up this Thursday and get final inspection on Friday, allowing Monday to fix any items and get CO next Tuesday in time to move in next Thursday.
PETE & TODD:
--ORB latch for craft room door
--Finish door hardware on barn/ ext garage
-install door knocker
-adjust self closing door south bedroom and master closet door
--Adjust middle door in Rodden's window seat (hard to open/close)
--Hang rod in laundry room
--Plane exercise room door-- too tight with carpet. Check others
--See Andrew and Kaly for other additional work.
FRAMERS (LONNIE):
--Finish barn columns
--Mount window boxes (supplied in garage)
--Trim at master balcony roof
--Install shutters, window boxes and corbels
--Temporary steps for final
--install weather vane
--Price on pergolda
ELECTRICIAN:
--Connect Phone lines
--Hookup AC units
--Adjust heights of some fixtures (maybe already done)
--Hang master bath chanedlier and master sitting chandelier after final
--Install wireless Nuotone doorbell, Oil rubbed bronze bell
Plumber
--Finish Trim out
--Replace brazen bronze fixtures (trip levers and laundry faucet are wrong). Needs to be oil rubbed bronze. (Some have been changed, some have not been.
--Replace/correct supply lines and drain to master bathtub and move bathtub to the right to center in the space
--Test pressure booster, water heaters, water heater recirc pump, etc.
--Replace kitchen sink drain with an ORB drain.
--Extend sump pump discharge around AC units and out into swale
FIRE DEFENSE:
--Missing a couple trim caps in basement under stairs
Garage:
--Install hinges and handles on outside
MOROS FABRICATION:
--Buff out any remaining scratches (seveal scratches at time of install) (FRIDAY scheduled)
DRYWALL: (RUSH)
--Repair in powder room behind light? (Maybe painters can do)
--Repair at outlet in laundry rooom.
ROOFER:
--Finish chimmney cap
--Missing shingles at front (little section)
--Scoopers at master deck
HVAC:
--Vent covers, test ac, new filter, clean and service HVAC (dust).
Duct Cleaning:
-Schedule duct cleaning
Asphalt
--Driveway all the way up to both garages
Drainage contractor
--Caps on window well drains
Steel:
--Complete front starircase railing outside, window wells, ladders, balcony. Provide estimate on gate and wing fence. Coordinate with owner on railing design. Owner has provided some S scroll and decorative pieces to be included in railings.
Stucco:
--Seam appears a little noticeable at kitchen nook?
MASON:
--grout at roof line.
--Adjust for drainage at front door
We are shooting to have most of this wrapped up this Thursday and get final inspection on Friday, allowing Monday to fix any items and get CO next Tuesday in time to move in next Thursday.
PETE & TODD:
--ORB latch for craft room door
--Finish door hardware on barn/ ext garage
-install door knocker
-adjust self closing door south bedroom and master closet door
--Adjust middle door in Rodden's window seat (hard to open/close)
--Hang rod in laundry room
--Plane exercise room door-- too tight with carpet. Check others
--See Andrew and Kaly for other additional work.
FRAMERS (LONNIE):
--Finish barn columns
--Mount window boxes (supplied in garage)
--Trim at master balcony roof
--Install shutters, window boxes and corbels
--Temporary steps for final
--install weather vane
--Price on pergolda
ELECTRICIAN:
--Connect Phone lines
--Hookup AC units
--Adjust heights of some fixtures (maybe already done)
--Hang master bath chanedlier and master sitting chandelier after final
--Install wireless Nuotone doorbell, Oil rubbed bronze bell
Plumber
--Finish Trim out
--Replace brazen bronze fixtures (trip levers and laundry faucet are wrong). Needs to be oil rubbed bronze. (Some have been changed, some have not been.
--Replace/correct supply lines and drain to master bathtub and move bathtub to the right to center in the space
--Test pressure booster, water heaters, water heater recirc pump, etc.
--Replace kitchen sink drain with an ORB drain.
--Extend sump pump discharge around AC units and out into swale
FIRE DEFENSE:
--Missing a couple trim caps in basement under stairs
Garage:
--Install hinges and handles on outside
MOROS FABRICATION:
--Buff out any remaining scratches (seveal scratches at time of install) (FRIDAY scheduled)
DRYWALL: (RUSH)
--Repair in powder room behind light? (Maybe painters can do)
--Repair at outlet in laundry rooom.
ROOFER:
--Finish chimmney cap
--Missing shingles at front (little section)
--Scoopers at master deck
HVAC:
--Vent covers, test ac, new filter, clean and service HVAC (dust).
Duct Cleaning:
-Schedule duct cleaning
Asphalt
--Driveway all the way up to both garages
Drainage contractor
--Caps on window well drains
Steel:
--Complete front starircase railing outside, window wells, ladders, balcony. Provide estimate on gate and wing fence. Coordinate with owner on railing design. Owner has provided some S scroll and decorative pieces to be included in railings.
Stucco:
--Seam appears a little noticeable at kitchen nook?
MASON:
--grout at roof line.
--Adjust for drainage at front door