Hardwood floors in progress.

The hardwood floors are now in the process of being filled, sanded, stained and finished (one coat now, and one final coat at the last minute)

The masonry guys did the fireplace and stove back splash this weekend. They had to redo the hearth today because they did it wrong, but it looks good now. This was a big worry when we saw it was wrong Sunday morning until it was fixed today.

A lot of the plumbing has been completed (despite several reminders they still put on the wrong colored trip levers on the toilets so they'll have to redo that).

We would have liked to have moved the island a few inches, but now that it is all assembled that would be nearly impossible-- in the future that would be something to confirm at time of installation. We would have also moved the claw foot tub a couple inches, but I suspect that is too late because the plumbing is all in.

The stone on the outside is almost done. Painters got a lot of the outside paint work done today. A lot of the electrical outlets are trimmed out and a lot of lights are up, although not too much else can happen inside this week.

Meet the steel guy tomorrow to go over the window well and outside railings.