Tile and Trim

I hired Steve Yates yesterday to do the tile. He seems very experienced (18 yrs) and good references, and a very good price. We're still making some changes to the trim pieces at the showers-- strangely the bullnose cost the same as decorative trim pieces (I wish I would have known before ordering all the bullnose).
We decided to add the wainscot all the way up the stairs ($1000 labor + materials) and beadboard in the main floor 3/4 bath ($400). Here's Pete working on the wainscot at the stairs.
Curious if the drywallers will show up today-- conflicting opinions on how long it will take to get it right (Tim, the owner says 5 minutes a room, Doug thought two guys 15 hours each, Diego- the one actually doing the work just looked bewildered). We also need to uncover the niches at the tubs that the drywallers covered up, but know one knows for sure where they are located.
Stucco should be about done since we've had good weather, but we still need the front steps and all the stone work.