Second Floor Progresses
Work is finally progressing on the second floor. Because of the issue with the beam in the entry area and also raising the beam in the garage a lot of the floor framing changed and several large steel "saddles" to hold wooden beams had to be fabricated.
The framing on the second story walls is happening today-- that goes fairly fast.
There is an issue with the South family room dormer (front of house). The roof trusses as presently designed don't allow enough room to properly frame out the dormer. Izzie (Framer) need to speak with Lonnie (his boss), Doug and/or Kyle to see what needs to be done. It may be the trusses need to be returned and rebuilt.
When you look at the plans you sort of assume all of this will fit together, but in the field a a good framer that can visualize everything is key. These guys seem to be doing a good job and have a good attitude even when they run into problems. My sense is that they are about a week behind where they thought they would be with the framing.
The framing on the second story walls is happening today-- that goes fairly fast.
There is an issue with the South family room dormer (front of house). The roof trusses as presently designed don't allow enough room to properly frame out the dormer. Izzie (Framer) need to speak with Lonnie (his boss), Doug and/or Kyle to see what needs to be done. It may be the trusses need to be returned and rebuilt.
When you look at the plans you sort of assume all of this will fit together, but in the field a a good framer that can visualize everything is key. These guys seem to be doing a good job and have a good attitude even when they run into problems. My sense is that they are about a week behind where they thought they would be with the framing.