Roof started
They started putting on the roof today. Looks like it will go quickly. Unfortunately the detached garage remodel hasn’t been started yet, so they’ll have to come back to roof that. Fire Defense is finishing up. The framers should frame the extra room and bathroom in the basement tomorrow. Electricians have been gone for the last two days (maybe waiting for it to dry up), but I think they were there today getting the main power feed hooked up. Conduit was added down the driveway and across the neighbor’s driveway, which should be better than direct bury cable. Phone will also go up the conduit and we added conduit for power and CAT 5 to the gate. Gas is a separate trench. We also got some road base laid down on the driveway so hopefully mud won’t be such a problem in the future.