Boulder Custom Home

Watch a custom home be built from the ground up.

Name: Andrew Batson

Friday, August 25, 2006

A few changes upstairs

Kyle (architect) agreed that the landing at the top of the stairs is too tight (was 3’6”).  He redesigned the bedroom closet and bath.  Kaly and I suggested a few more tweaks to the revision (basically making a door to the bath and a door to the closet instead of one pocket door to both).

We let Doug know we wanted to make those changes so the framers will probably do that after they finish the roof. They will also move the wall in the exercise room at the same time.

We are also going to add a second window in the loft of the same size as the first.  Kyle thought we could just center the current one (as currently placed it looks good from the outside, but is off center and looks at the chimney from the inside).  Kaly would like the extra light and isn’t worried about wall space so we’re just going to add a second window.

The well stopped working yesterday and our neighbors were out of water (we share the well).  I had recently installed a remote transmitter on it so it would fill the cistern automatically.  Luckily the well company (Ground Water Pump Systems of Boulder)  got someone out this morning and fixed the wiring.

0 Comments:

Post a Comment

<< Home