Boulder Custom Home

Watch a custom home be built from the ground up.

Name: Andrew Batson

Friday, July 21, 2006

Basement floor poured

They poured the basement floor today. They started at 6am and were done around 11am.  Now the framers will put the first floor in place (for stability) and then Harold will now backfill the garage, they’ll finish the one window well, the supports on the west window well and pour those items.  

The perimeter drain was finished up this week as well and would have been inspected by the soil engineers (the waterproofing and perimeter drain, including the radon piping, is a separate sub from the plumber). The plumber put in the bathroom rough in the basement and the ejector pit.

0 Comments:

Post a Comment

<< Home